Click here to make tpub.com your Home Page

Page Title: Rustproofing Inspection.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-15. Rustproofing Underbody (M151A2, M718A, and M825).
Up
TB-43-0213 Corosion Prevention and Control Including Rustproofing Procedures for Tactical Vehicles and Trailers Manual
Next
CHAPTER 5. 1 1/4-TON TRUCK: M880 AND M890 SERIES

TB 43-0213
4-5.
inspection is delayed too long, rustproofing
Rustproofing Inspection.
compound may drip from access holes.
a. Check the vehicle to ensure that all areas
requiring rustproofing compound have been properly
b. Plug access holes.
and completely coated.
(1) Check seams, welds, corners, and boxed
areas to ensure that they are adequately coated.
(2) Check wet film thickness with a wet film
thickness gage (see Figure 4-16). A wet film thickness
of 10 mils is required. In areas where a wet film
thickness of 10 mils cannot be obtained or where
thickness cannot be measured, inspect for complete-
ness of coverage.
(3) Check all drain holes to ensure that they are
open.
(4) Check all inspection holes and drilled
access holes to ensure that compound coverage is
adequate. Use of a high intensity inspection light will
help with this process.
(5) Check vehicle to ensure that no compound
TA504789
has been applied to prohibited areas (see CAUTION,
Figure 4-16. Film Thickness Gage,
4-6.
Component Installation.
NOTE
Plugging of access holes may be delayed
Install all components that were removed in
paragraph 4-1 of this chapter (see TM 9-2320-218-20
until after vehicle inspection, if inspection
and TM 9-2320-218-34).
occurs immediately after rustproofing. If
4-13/(4-14 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us