Click here to make tpub.com your Home Page

Page Title: Drilling Top of Doors
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Drilling Front Fenders and Rocker Panels
Up
TB-43-0213 Corosion Prevention and Control Including Rustproofing Procedures for Tactical Vehicles and Trailers Manual
Next
Drilling Rear Window Frame

TB 43-0213
Front
Doorjambs
(see
j. Drilling
Lower
h. Drilling Top of Doors (see Figure 5-8). Drill
Figure 5-10). Drill one hole A in the lower front area
four holes A, B, C, and D in the top of each door.
of each doorjamb. The hole is to be sight drilled.
Holes are sight drilled.
TA504797
Figure 5-8. Drilling Top of Doors.
TA504799
Figure 5-10. Drilling Lower
i. Drilling Front of Doors (see Figure 5-9). Drill
Front Doorjambs.
four holes A, B, C, and D in the front of each door.
Holes are to be sight drilled with holes A and B
k. Drilling Roof and Top of Doorjambs (see
approximately 10 inches (25.4 cm) apart.
(1) Drill a total of 12 holes in the roof and the
top of doorjambs on both sides.
(2) Holes A are drilled 3 1/4 inches (8.3 cm) to
the rear of metal joint. Holes B are drilled 2 inches
(5.1 cm) forward of metal joint. Holes C and D are
drilled at 6-inch (15.2 cm) intervals forward of hole B.
(3) Holes E and H are drilled directly in line
with headlined side creases and 1 3/4 inches (4.4 cm)
from the front headlined crease.
(4) Holes F and G are drilled at approximately
13-inch (33 cm) intervals from holes E and H, and
1 3/4 inches (4.4 cm) from the front headlined crease.
TA504798
Figure 5-9. Drilling Front of Doors.
5-4

Privacy Statement - Press Release - Copyright Information. - Contact Us