| ||||||||||
|
|
![]() ![]() TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
Figure 2-19. Hoses, Lines, and Fittings
12
HOSES, LINES, AND FITTINGS
·
·
Check all hoses, lines, and fittings for leaks, cracks, or
The hose lines or fittings
chafing. Notify your supervisor of any damaged hoses or
leak
fittings.
13
FORMULATION TANK
·
a. Make sure valves turn smoothly.
The formulation tank leaks
air or fluid
·
b. Check valves and fittings for leaks.
(1) Turn solenoid valve switch OFF.
(2) Start engine according to engine startup proce-
dures in Chapter 2, Section III.
2-16
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |