| ||||||||||
|
|
![]() ![]() TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
FORMULATION TANK (Continued)
Figure 2-20. Formulation Tank
(3) Check around valves and fittings for air or fluid
leaks. Notify your supervisor of any leaks or damaged
components.
·
c. Check tank pressure gage.
(1) Check gage for physical damage. Notify your
supervisor of any damage.
(2) When tank is pressurized, pressure gage should
read 10 to 15 psi.
2-17
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |