| ||||||||||
|
|
![]() ![]() TM 5-3740-214-14
Table 2-1. Operator Preventative Maintenance Checks and Services (Continued)
B - Before
D - During
A - After
INTERVAL
FOR READINESS REPORT-
ITEM
ITEM TO BE INSPECTED.
ING, EQUIPMENT IS NOT
NO.
B
D
A
PROCEDURE
READY/AVAILABLE IF:
Figure 2-23. Base Assembly
16
BASE ASSEMBLY
·
·
Make sure attaching nuts and bolts are securely tightened.
The base assembly is not
securely installed
2-20
|
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |