Click here to make tpub.com your Home Page

Page Title: OPERATION PRE-CHECK
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
ENGINE START-UP PROCEDURES
Up
TM-5-3740-214-14 Aerosol Generator Non-Thermal Insecticide Unltra-Low Volume Model XKA (NSN 374001-076-1341) Manual
Next
OPERATION PRE-CHECK (Continued)

TM 5-3740-214-14
ENGINE START-UP PROCEDURES (Continued)
c.
Make sure the solenoid valve switch is turned OFF.
Figure 2-29. Ignition Switch
d.
Turn the ignition switch ON.
e.
Push the start button and hold it in until the engine starts.
NOTE
If the engine is difficult to start, open the compressor pulsation tank drain valve to decrease the
engine load.
f.
If the engine does not start, refer to the troubleshooting instructions in Chapter 3, Section II.
g.
As the engine warms up, gradually open the choke.
h.
Perform the pre-operation checks and services.
OPERATION PRE-CHECK
WARNING
BE ALERT not to touch the compressor, separator or nozzle assembly while performing operation
pre-checks. These parts get hot when the compressor is running.
BE ALERT not to walk in front of the nozzle when the compressor is running.
a.
Allow the engine to run for five minutes before performing the operation pre-checks.
b.
Check the formulation tank pressure gage.
(1) The pressure gage should read 10 to 15 psi.
(2) If the pressure gage reads greater than 15 psi, shut the engine ignition switch OFF, and turn to the
troubleshooting procedures in Chapter 3, Section II.
2-25

Privacy Statement - Press Release - Copyright Information. - Contact Us