Click here to make tpub.com your Home Page

Page Title: Section XII. MAINTENANCE OF FOLDING FLOOR
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-21. Folding floor support assembly, removal, disassembly, reassembly and installation
Up
TM-10-5410-223-14-1 Shelter Multi Purpose Medical Unit Self-Contained Transportable (MUST); (Brunswick Model CW1) NSN 5410-00-809-6634 Manual
Next
Figure 4-22. Access door assemblies, removal and installation (sheet 1 of 3 ).

TM 10-5410-223-14/1
Section XII. MAINTENANCE OF FOLDING FLOOR
a. Inspection.
dents and holes.
(1) Inspect all parts for wear and damage.
b. Repair. Repair damaged floor accordingly.
(2) Inspect the raw panel for cracks, breaks,
Section XIII. MAINTENANCE OF DOORS, PANELS, WINDOWS
4-22. Left and Right Hand Access Door Assembly
3), and loosen and/or remove mounting screws.
(2) Swing door outward, figure 4-22 (sheet 2 of
NOTE
3), and loosen and/or remove mounting screws.
Removal procedures listed below are appropriate for
(3) Lift swing door panel, figure 4-22 (sheet 3 of
both door assemblies.
3), away from shelter wall.
a. Removal.
(1) Swing door inward, figure 4-22 (sheet 1 of
4-69

Privacy Statement - Press Release - Copyright Information. - Contact Us