Click here to make tpub.com your Home Page

Page Title: Figure 4-19. Preparation for cargo installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-18. Cargo tiedown installationnn
Up
TM-10-5410-223-14-1 Shelter Multi Purpose Medical Unit Self-Contained Transportable (MUST); (Brunswick Model CW1) NSN 5410-00-809-6634 Manual
Next
Figure 4-20. Folding roof support assembly, removal, disassembly, reassembly and installation

TM 10-5410-223-14/1
Figure 4-19. Preparation for cargo installation.
Section X. MAINTENANCE OF FOLDING ROOF SUPPORT AND FOLDING
FLOOR SUPPORT ASSEMBLIES
b. Disassembly.
4-20. Folding Roof Support Assembly
(1) Remove rivet (6, fig. 4-20) and remove the
a. Removal.
pin assembly (7).
(1) Remove screw (1, fig. 4-20) and washer (2)
(2) Remove retaining ring (8) and pin (9) and
securing the support assembly to the folding roof.
separate the bar (10) from the support (11).
(2) Remove screw (3) and washer (4) securing
the support assembly to the shelter, and remove the
folding roof support assembly (5).
4-66

Privacy Statement - Press Release - Copyright Information. - Contact Us