Click here to make tpub.com your Home Page

Page Title: FRAME 4
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
FRAME 3
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
Schematic Drawing

TM 9-2350-222-20-2-1
SYNCHRONIZATION AND BACKLASH CHECK OF 165 MM GUN WITH
3-4.
GUNNER'S PERISCOPE M32C-RAMP METHOD (CONT)
Procedure
Step
NOTE
Always lay the gun and reticle, when rotating boresight
knobs (1) and (2), from low to high and from right to left
without overtravel. Recheck sight retitles to insure that
reticle movement did not occur after slipping scales on
boresight knobs. If movement occurred after boresight
knobs are locked, relay retitles and recheck for movement.
If movement of periscope reticle exceeds 0.1 mil, notify
support maintenance. (Thickness of reticle lines equal 0.1
mil.)
Index 89 mils on the gunner's quadrant M1A1 (3) and place quadrant on breech ring
1.
quadrant seats with Line-of-Fire arrow facing breech end of 165-MM gun.
NOTE
Hold quadrant in place when tank is being moved.
Have driver back tank up ramp or hill until the bubble in gunner's quadrant M1A1 (3)
2.
is approximately centered.
Stop tank and shut down power plant.
3.
W bile looking through breech boresight hole (4) with binoculars (5), manually position
4.
gun without over travel so that cross formed by threads (6) on gun muzzle is lined up
with target aiming point (TM-10).
GO TO FRAME 5
Para 3-4 Cont
3-14

Privacy Statement - Press Release - Copyright Information. - Contact Us