Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
WINCH AND BOOM CHECKOUT
Up
TM-9-2350-222-20-2-1 Turret for Combat Engineer Vehicle M728 (2350-00-795-1797) Manual
Next
SYNCHRONIZATION AND BACKLASH CHECK OF 165-MM GUN WITH GUNNER'S PERISCOPE M32C6/M32CE1-RAMP METHOD

TM 9-2350-222-20-2-1
WINCH AND BOOM CHECKOUT (CONT)
3-3.
FRAME 2
TROUBLESHOOTING
REFERENCE
PROCEDURE
STEP
1.
Check winch and boom hydraulic oil reservoir for full oil
level (TM-10).
2.
Perform the following operations (TM-10)
a. Set reservoir suction shutoff valve open
b. Set selector control valve lever to NEUTRAL
c. Start engine
d. Set HYDRAULIC PUMP switch to ON
3.
Insure that red hydraulic falter indicators are not showing
(TM-10).
Para 4-3
4.
Check that boom moves smoothly and at proper rate with
boom control valve lever (TM-10).
Lifting capacity is 17,500 pounds
with single part line rigging.
Para 4-3
With a load suspended from cable check that winch drum
5.
raises and lowers smoothly and at proper rate with winch
control valve lever (TM-10).
6.
Check that winch brake can hold a load suspended.
Para 4-3
7.
Boom moves steadily and does not drop rapidly after
passing top dead center when stowing boom with winch
(TM-10).
Perform the following boom stowing operations (TM-10):
8.
a. Secure staylines in J-hooks
b. Secure boom in travel locks
c. Set HYDRAULIC PUMP switch to OFF
d. Stop engine.
END OF TASK
Para 3-3 Cont
3-9

Privacy Statement - Press Release - Copyright Information. - Contact Us