Procedure
Up
TM-11-6130-243-14-2 Power Supply PP-4606B/G (NSN6130-00-504-0327) Manual
Next
Procedure

TM 11-6130-243-14-2
ZM-21A/U meter reading at T1 is greater than
6-5. Insulation Resistance Test
10 megohms.
a. Test Equipment. The only test equipment
(4) Disconnect the ZM-21A/U from the PP-
required is Ohmmeter ZM-21A/U.
4606B/G.
b. Test Connection and Conditions. This test
is performed with the PP-4606B/G disconnect-
6-6. Output Power Test at 440-Volt Input
ed from the ac power source, and is used to
a. Materials.
check the insulation resistance of the primary
windings of power transformer T1, The test is
(1) Resistance element, 0.41-ohm, 3,400-
written for the PP-4606B/G connected for 220-
watt; 3 each.
volt ac operation.
(2) Power cable (as fabricated).
c. Procedure.
(3) Mating connector (FSN 5935-236-46-
40).
(1) Connect the ZM-21A/U ground lead
to the PP-4606B/G frame.
b. Test Connections and Conditions. Connect
(2) Connect the ZM-21A/U line lead to
the equipment as shown in figure 6-2. (This test
any terminal of the primary windings of T1.
is written for operation of the power supply at
440-volt ac.) Do not connect the load to the
(3) Operate the ZM-21A/U and observe the
power supply until instructed to do so in the
indication on the ZM-21A/U meter. The PP-
procedure given in c below.
4606B/G meets the performance standard if the