Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-8. Starting the Generator Set (Sheet 1 of 3)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Figure 2-7. Voltage Reconnection Board
Up
TM-9-6115-464-12 Wrench Impact Hydraulic Model MV-12-140T Manual
Next
Figure  2-8.  Starting  the  Generator  Set  (Sheet  2  of  3)

ARMY TM 9-6115-464-12 AIR FORCE TO 35C2-3-445-1 NAVY NAVFAC P-8-624-12 NEVER ATTEMPT TO START THE GENERATOR SET IF IT IS NOT PROPERLY GROUNDED. FAILURE TO OBSERVE THIS WARNING MAY RESULT IN SERIOUS INJURY OR DEATH BY ELECTROCUTION. DO NOT RUN OR START ENGINE FOR ONE HOUR AFTER WASHING THE ENGINE AND COMPONENTS. THE FUEL INJECTOR PUMP MAY SEIZE UP. EQUIPMENT DAMAGE COULD RESULT IF CAUTION IS NOT OBSERVED. DO NOT CRANK THE ENGINE IN EXCESS OF 15 SECONDS. ALLOW THE STARTER ASSEMBLY TO COOL AT LEAST 15 SEC- ONDS BETWEEN CRANKING. EQUIPMENT DAMAGE COULD RESULT IF CAUTION IS NOT OBSERVED. SLAVE RECEPTACLE IS TO BE USED WHEN EXTRA CRANKING POWER IS REQUIRED FOR STARTING UNIT. OTHER METH- ODS ARE NOT AUTHORIZED. Step 1. HOLD THE START-RUN-STOP SWITCH IN THE START POSITION UNTIL THE ENGINE OIL PRESSURE GAUGE INDICATES OIL PRESSURE,  AND  VOLTMETER  INDICATES  VOLTAGE. Step 2. RELEASE THE START-RUN-STOP SWITCH TO THE RUN POSITION Figure 2-8. Starting the Generator Set (Sheet 1 of 3) 2-16

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing