Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TM-5-6115-585-12_93
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
TM-5-6115-585-12_92
Up
TM-5-6115-585-12 Generator Set Diesel Engine Driven Tactical Skid Mtd 5 KW 1 Phase 2 Wire 1 Phase-3 Wire 3 Phase-4 Wire 120 120/240 and 120/208 Volts Manual
Next
TM-5-6115-585-12_94

TM    5-6115-585-12 NAVFAC    P-8-623-12 TO-35C2-3-455-1 TM-05684C/05685B-12 ( 3 )    F u e l    P u m p    A s s e m b l i e s    ( T h r e e )    ( s e e    f i g u re 3-14).   Inspect   fuel   pumps   (1)   for   dents   or   other   phys- ical    damage.    Check    for    leaks    especially    around    hose assembly    fittings    (2).    Check    that    fuel    pumps    are    se- curely a t t a c h e d     t o     m o u n t i n g     b r a c k e t     ( 3 )     a n d     t h a t mounting   bracket   is   securely   attached   to   bracket   sup- port on skid-base. Inspect electrical leads to fuel pumps to see that wires and connectors are not b r o k e n ,     f r a y e d ,     o r     d a m a g e d .     C h e c k     t h a t     c o n n e c t o rs are   tightly   connected.   Check   that   cap   (4)   on   auxiliary fuel   pump   inlet   is   securely   in   place   when   unit   is   not being    run    from    auxiliary    fuel    supply. (4)   Fuel   Hoses.   Inspect   fuel   hoses   (2,   3   and   4, figure   3-13)   for   leaks   or   physical   damage.   Check   to see    that    fuel    hose    fittings    are    securely    tightened    in p l a c e . b.    Service. (1)   Fuel   Filter   Assemblies   (see   figure   3-13).   Daily before   and   after   operation,   open   drain   valves   (1)   and   drain water    and    sediment    from    assemblies. (2)   Fuel   Strainer   Assembly.   Daily,   before   and   after operation,   open   drain   valves   (1)   and   drain   water   and   sedi- ment   from   strainer   assembly   (11). Figure   3-14.   Fuel   Pump   Assembly Figure   3-15.   Control   Cubicle   Support   Assembly 3-21.  C O N T R O L     C U B I C L E     S U P P O R T     A S S E M B L Y, S P E E D    C O N T R O L    A N D    E N G I N E    C O N T R O L WIRING    HARNESS. a .    I n s p e c t. ( 1 )     V i b r a t i o n     M o u n t s     ( F o u r )     ( s e e     f i g u r e     3 - 1 5 ) . I n s p e c t    v i b r a t i o n    m o u n t s    f o r    d e t e r i o r a t i o n    o r    p h y s i- cal   damage.   Inspect   mounts   to   see   that   they   are   free o f     d i r t ,     f u e l ,     o r     o i l .     C h e c k     t o     s e e     t h a t     m o u n t s     a r e securely   attached   to   control   cubicle   support   on   skid- b a s e .    I f    m o u n t s    a r e    f a u l t y ,    r e f e r    t o    h i g h e r    l e v e l    of m a i n t e n a n c e. (2)   Engine   Control   Wiring   Harness   Assembly.   On   ASK equipped   generators,   open   or   remove   all   access   doors.   Inspect wiring   harness   for   broken   or   frayed   wires.   Check   for   wires   with damaged   or   deteriorated   insulation.   Check   that   all   connectors   and terminals   are   clean   and   tight. (3)   Speed   Control   Assembly   (see   figure   3-16).   On   ASK equipped   generators,   lift   motor   speed   control   flap.   Inspect   to   see that   speed   control   is   firmly   attached   to   unit.   Check   that   speed control  moves  in  and  out  freely.  If  speed  control  is  loose,  refer  to higher   level   maintenance. 3-20 C h a n g e    8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing