TM 9-2350-222-20-1-5
HYDRAULIC SUCTION LINE SHUTOFF VALVE REPLACEMENT (Sheet 1 of 6)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Cleaning and Inspection
Installation
1/2 in. combination box and
TOOLS: 3/4 in. socket with 1/2 in. drive
open end wrench
1/4 in. electric drill
7/16 in. combination box and
3/16 in. twist drill
open end wrench
Cold chisel
11/16 in. combination box and
Ball peen hammer
open end wrench
Slip joint pliers
3/4 in. combination box and
1/8 in. drive punch
open end wrench
Vise
10 in. extension with 1/2 in. drive
1/8 in. twist drill
SUPPLIES: Locknuts (MS51922-13) (8 required)
Drive screws (MS21318-8) (4 required)
Gaskets (10864321) (2 required)
Drive screws (MS21318-2) (2 required)
Dry cleaning solvent (Item 54,
Pin (MS39086-158)
Pin (MS39086-163)
Engine oil (Item 43,
Preformed packing (MS28775-232)
(4 required)
PERSONNEL: Two
REFERENCES:
LO 9-2350-222-12
TM 9-2350-222-10
PRELIMINARY PROCEDURES:
Rotate turret for access to reservoir (TM 9-2350-222-10)
Drain hydraulic reservoir (LO 9-2350-222-12)
Go on to Sheet 2
TA141180