TM 9-2350-222-20-1-5
HYDRAULIC SUCTION LINE SHUTOFF VALVE REPLACEMENT (Sheet 5 of 6)
Install handle extension (D) onto valve (E).
2.
Using hammer, install new spring pin (F).
Install spring (G) onto handle extension (D) and
3.
valve (E).
4.
Install handle (A) onto handle extension (D)
with new spring pin (H).
5.
Using pliers, turn spring (G) one-quarter turn
(900) clockwise (direction of arrow) and install
into notch on handle (A).
Install gasket (J) onto eight studs (K) on
6.
reservoir mount.
7.
Install valve (E) on eight studs (K) onto
reservoir mount.
8.
Install gasket (L) onto eight studs (K) and valve
(E).
9.
Install adapter (M) onto eight studs and valve
(E).
10.
Using pliers, install spring (G) into hole in
adapter (M).
11.
Using 1/2 inch wrench, install eight new
locknuts (N) onto eight studs (K).
Go on to Sheet 6
TA141184
18-82