TM 9-2350-222-20-1-4
SHIFT LINKAGE ADJUSTMENT (Sheet 16 of 20)
118. Using two 9/16 inch wrenches, loosen jamnut
(BM).
119. Using 9/16 inch wrench, turn rod bearing end
(BH) clockwise until rod (BJ) is past hole (BL).
120. Using 9/16 inch wrench, crowfoot wrench, and torque wrench, tighten jamnut (BM) to 15-20 lb-ft
(20-27 N.m).
121. Using 9/16 inch wrench, adjust stud and rod end bearing assembly by turning rod bearing end (BG)
clockwise or counterclockwise until distance between centers of rod bearing ends (BG) and (BH)
measures 5-3/4 inches.
122. Using 9/16 inch wrench, crowfoot wrench, and
torque wrench, tighten jamnut
(BF) to
15-20 lb-ft
(20-27 N.m).
123. Using hands, install stud and rod bearing
assembly (BE).
124. Using 9/16 inch wrench, install two screws
125. Using hands, install two shift linkage control
cover plates (AR).
126. Using 7/16 inch wrench, install 5 screws and
10 washers (AQ).
Go on to Sheet 17
TA253375
Change 1 11-17