TM 9-2350-222-20-1-4
SHIFT LINKAGE ADJUSTMENT (Sheet 12 of 20)
75.
Using 9/16 inch wrench, remove 5 screws and
10 washers (AQ).
76,
Using hands, remove two shift linkage control
cover plates (AR).
Try to insert locating pin in alinement hole
77.
(AS). If locating pin can be inserted, go to step
106. If locating pin cannot be inserted, go on to
step 78.
78.
Using 9/16 inch wrench, loosen jamnuts (AT)
and (AU).
79.
Using 9/16 inch wrench, remove screw (AV).
Manually move clevis (AW).
80.
Insert locating pin into alinement hole (AS).
NOTE
Do not allow shift rod (AY) to turn
while doing step 81.
Shift rod
(AY) is made up of more than one
piece and may come apart if
allowed to turn.
81.
Using 9/16 inch wrench, adjust shifting rod
bearing end (AX) by turning clockwise-or
counterclockwise until screw (AV) drops freely
82.
Using small diameter wire (Item 59, Appendix
through clevis (AW) and shifting rod bearing
D), check to see if shift rod (AY) is past holes
end (AX).
(AZ) and (BA). If shifting rod (AY) is past
holes (AZ) and (BA), do steps 83 thru 86. If
shifting rod (AY) is not past hole (AZ), do
steps 87 thru 95. If shifting rod (AY) is not
past hole (BA), go to step 96.
83.
Using 9/16 inch wrench, install screw (AV).
84.
Using crowfoot and torque wrenches, tighten
jamnuts (AT) and (AU) to 15-20 ll-ft (20- 27
N.m).
85.
Remove locating pin from alinement hole
(AS).
86.
Using 9/16 inch socket and torque wrench,
tighten screw (AV) to 15-20 lb-ft (20-27 N.m)
and go to step 106.
Go on to Sheet 13
TA253371
Change 1 11-13