TM 9-2350-222-20-14
SHIFT LINKAGE ADJUSTMENT (Sheet 14 of 20)
98. Using 9/16 inch wrench, install screw (BB)
through clevis (AH) and shifting rod bearing
end (BC).
99. Using crowfoot and torque wrenches, tighten
jamnut (AU) to 15-20 lb-ft (20-27 N.m).
100. Using 9/16 inch socket and torque wrench,
tighten screw (BB) to 15-20 lb-ft (20-27 N.m).
101. Using 9/16 inch wrench, adjust shifting rod
bearing end (AX) by turning clockwise or
counterclockwise until screw (AV) drops free-
ly through clevis (AW) and shifting rod
bearing end (AX).
102. Using 9/16 inch wrench, install screw (AV)
through clevis (AW) and shifting rod bearing
end (AX).
103. Using crowfoot and torque wrenches, tighten
jamnut (AT) to 15-20 lb-ft (20-27 N.m).
104. Remove locating pin from alinement hole
(AS).
105. Using 9/16 inch socket and torque wrench,
tighten screw (AV) to 15-20 lb-ft (20-27 N.m).
106. Using 9/16 inch wrench, remove two screws
(BD).
107. Using hands, remove stud and rod end bear-
ing assembly (BE).
108. Using rule, measure between center-to-center
of rod end holes. If measurement is 5-3/4
inches, assembly is in adjustment. Go to step
123. If measurement is not 5-3/4 inches, go
on to step 109.
Go on to Sheet 15
TA253373
Change 1 11-15