TM 9-2350-222-20-1-4
Using 9/16 inch wrench, install new lockwasher (AU), ground strap (V), flat washer (AV), and new
30.
self-locking nut (AW) to terminal (AX).
Using 9/16 inch wrench, install electrical lead (circuit 530), electrical lead (circuit 415), electrical
31.
lead (circuit 2), flat washer (AY) and new self-locking nut (AZ) to terminal (BA).
Using 3/8 inch wrench, install electrical lead (circuit 1), flat washer (BB) and new self-locking nut
32.
(BC) to terminal (AS).
Using 3/8 inch wrench, install electrical lead (circuit 478), flat washer (BD), and new self-locking
33.
nut (BE) to terminal (AT).
Connect engine for powerplant test run ground hop (page 5-48).
34.
35.
Start and run engine at idle speed according to procedures for powerplant test run (page 5-52).
36.
Check BATTERY-GENERATOR indicator in driver's compartment for proper indication.
Shut down and disconnect engine as prepared for powerplant test run (ground hop) (page 5-62).
37.
38.
Install 2A powerplant (page 5-14) or 2D powerplant (5-37).
End of Task
TA139573
10-18