Click here to make tpub.com your Home Page

Page Title: VOLTAGE REGULATOR ASSEMBLY REPLACEMENT (Sheet 1 of 3)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
TM-9-2350-222-20-1-4 Combat Engineer Vehicle Full-Tracked M728 2350-00-795-1797 (Hull) Manual
Next
REMOVAL-continued

TM 9-2350-222-20-1-4
VOLTAGE REGULATOR ASSEMBLY REPLACEMENT (Sheet 1 of 3
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
10 in. extension with 1/2 in. drive
Ratchet with 1/2 in. drive
Spanner wrench
7/16 in. combination box and open end wrench
3/8 in. combination box and open end wrench
3/8 in. socket with 1/2 in. drive
SUPPLIES: Lockwasher (MS35338-44) (4 required)
Lockwasher (MS45904-76)
REFERENCE TM 9-2350-222-10
PRELIMINARY PROCEDURE: Disconnect three battery ground straps (Pg. 10-283)
REMOVAL:
1.
Open turret platform access cover (A) (TM 9-2350-222-10).
2.
Manually traverse turret to gain access to voltage regulator (B) (TM 9-2350-222-10).
Change 1 10-19

Privacy Statement - Press Release - Copyright Information. - Contact Us