Click here to make tpub.com your Home Page

Page Title: Figure 3-20. Aligning pump assembly.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Terminal Lugs
Up
TM-3-6665-302-34 Detector Unit Chemical Agent Automatic Alarm M43 and Chemical Agent Automatic Alarm M42 Manual
Next
Section VI. CHASSIS ASSEMBLY (1A2A2)

TM 3-6665-302-34
NOTE:
DESIGNATES PART OF
M74 TEST SET.
M U3 9 7 9 2 4
5 Screws
3 Electrical connector
1 Head assembly
6 Vertical shaft
4 Jig assembly
2 Ports
Figure 3-20. Aligning pump assembly.
(4) Position voltage regulator (6) on pump
(4) Unsolder
red and green wires from ter-
unit subassembly (29) with mounting holes
minals.
alined with holes in top of pump unit subassem-
(5) Unsolder violet wire from terminal lug
bly (29).
on motor (7).
(5) Secure voltage regulator (6) to pump
(6) Remove two screws (5) from electrical
unit subassembly (29) with screws (3) and
connector 1A2A1P1.
lockwashers (4).
(7) Remove voltage regulator (6) from
(6) Install pump assembly in detector unit
pump unit subassembly (29).
assembly (para 3-25).
b. Installation.
3-33. Catches
(1) Insert violet lead from electrical con-
nector A1P1 through access hole in top of pump
unit subassembly (29). Solder lead to lug on
a. Removal.
motor (7).
(1) Raise latch of catch (28) and remove
(2) Install and tighten two screws (5)
screws (27).
through electrical connector A1P1 to pump unit
(2) Remove catch (28) from pump unit
subassembly (29).
subassembly (29).
(3) Using detail A as a guide, solder red
b. Installation.
and green leads from motor B1 (7) to terminals
on bottom of replacement voltage regulator (6).
(1) Position replacement catch (28), with

Privacy Statement - Press Release - Copyright Information. - Contact Us