Click here to make tpub.com your Home Page

Page Title: Follow-on Tasks
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION-continued
Up
MWO-9-2330-390-25-1 Modification of M1022A1 Dolly Set Positioning Tube Reinforcement Manual
Next
APPENDIX D: HYDRAULIC SYSTEM BLEEDING

MWO 9-2330-390-25-1
APPENDIX C:
TOP AND BOTTOM BEAM AND HYDRAULIC LIFT
CYLINDER REMOVAL / INSTALLATION (Con't).
NOTE
·
Preformed packings should be lightly coated with hydraulic fluid before
installation.
23. Install two new preformed packings (4) and straight connectors (5) on positioning
cylinders (2) inside bottom beam (19 ­ Rear, 20 Front).
24. Connect two hose assemblies (6) to straight connectors (5) at positioning cylinders (2).
Follow-on Tasks:
·
Install toolbox (front dolly).
·
Bleed hydraulic system if necessary. (See Appendix D).
·
Check for leaks.
·
Remove wooden blocks from ends of bottom beam.
·
Ensure proper air inflation in air bags.
C-9

Privacy Statement - Press Release - Copyright Information. - Contact Us