Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
REMOVAL-continued
Up
MWO-9-2330-390-25-1 Modification of M1022A1 Dolly Set Positioning Tube Reinforcement Manual
Next
INSTALLATION-continued

MWO 9-2330-390-25-1
APPENDIX C:
TOP AND BOTTOM BEAM AND HYDRAULIC LIFT
CYLINDER REMOVAL / INSTALLATION (Con't).
b. INSTALLATION
1. Position bottom beam to align suspension mount tabs with suspension frame (9).
2. Using tapered chase pins supplied with kit, attach bottom beam to suspension frame (9).
Insure that washers (10) previously removed are reinstalled to consume gaps that may
exist.
3. Drive each tapered chase pin out of connection made in task 2 with clevis pin (12). Use
proper care to avoid inference with suspension member (9) and washers (10).
4. After each clevis pin (12) is installed, insert new cotter pin (9) to complete connection.
5. Attach cylinder shims (25) to tube mounts on bottom beam (19 ­ Rear, 20-Front) using
flat head screws (26). Torque each screw to 10 ft-lbs.
6. Position mounting tabs on lower vertical tube (33) between the tube mount tabs on the
bottom beam.
C-5

Privacy Statement - Press Release - Copyright Information. - Contact Us