Click here to make tpub.com your Home Page

Page Title: Chapter 4. UNIT MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section IV. TROUBLESHOOTING
Up
TM-9-6115-652-14-P Power Unit PU-760/M (NSN 6115-00-394-9581) MEP-114A 30 Kw 400 Hz Generator Set Manual
Next
Figure 4-2. Unpacking Power Unit.

TM
9-6115-652-14&P
CHAPTER
4
UNIT
MAINTENANCE
Section
I.
SERVICE
UPON
RECEIPT
OF
EQUIPMENT
4-1. Inspecting and Servicing Equipment. The power unit is unpacked, inspected, and serviced as
d e s c r i b e d in the following paragraphs. Unpacked equipment must be checked against the Equipment Packing List
to insure completeness. Discrepancies must be reported in accordance with instructions in DA Pam 738-750.
a . Unpacking
P o w e r U n i t . (See figures 4-1 and 4-2.) The generator set is packed in place on the trailer
frame. Before beginning the unpacking procedure, locate, remove and save the waterproof envelopes marked
Depreservation
Guide.
Figure 4-1.
Power Unit Packed for Shipment.
4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us