Click here to make tpub.com your Home Page

Page Title: Chapter 2. INSTALLATION AND OPERATING INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Section Il. DESCRIPTION AND DATA
Up
TM-11-6130-247-14-1 Power Supply PP-3940A/G (NSN 6130-00-460-2148) Manual
Next
Figure 2-2. Power Supply PP-3940-A/G, Front Panel Controls an Indicators.

TM 11-6120-247-14-1
CHAPTER 2
INSTALLATION AND OPERATING lNSTRUCTlONS
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
the cardboard carton.
2 - 1 . Unpacking
(4) Open the moisture and vapor proof barrier in
the cardboard container.
a. Packaging Data. When packed for shipment,
(5) Remove the enclosed cardboard carton.
Power Supply PP-3940A/G is placed in a carton and
(6) Cut the waterproof tape that seals the tap of
packed in a 7- by 19- by 11-inch outer corrugated car-
the cardboard carton.
ton. A typical packaging diagram is shown in figure
(7) Remove the humidity indicator, the desiccant,
2-1. The volume is 0.85 cubic foot and the total weight
and the pads.
is 35 pounds.
(8) Remove the power supply.
b. Removing Contents.
(1) Cut the waterproof tape that seals the top of
2-2. Checking Unpacked Equipment
the shipping carton.
a. Inspect the equipment for damage incurred dur-
(2) Remove the inclosed cardboard carton.
ing shipment. If the equipment has been damaged, re-
(3) Cut the waterproof tape that seals the top of
Ftgure 2-1, Power Supply PP-3940A/G, Packaging Diagram
2-1
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us