TM 9-2330-356-14
Place suitable containers at a convenient
b.
location near the hose reel compartment. Following the
operating instructions in Chapter 2, discharge about
80 gallons through each hose reel (M969, M969A1, M970,
WARNING
and M970A1). After evacuating the hoses, discharge the
remaining fuel through the bulk delivery hose. Shut off
All pumping procedures must be done
engine.
outside.
c.
bottom of filter/separator. Open valve to drain remaining
a. Remove all cleaning materials and equipment
fuel. Remove filter elements and replace with new ones
from the inside of the tank. Close manhole cover. Close
all valves and drain points. Put 200-300 gallons of the type
fuel to be hauled in the tank.
d.
Dispose of the purging fuel per Command SOP.
Section XXI. PREPARATION FOR STORAGE OR SHIPMENT
Items should be ready for use within the time
b.
factors determined by the directing authority.
a. This section contains requirements and
During the storage period appropriate
c.
procedures for administrative storage of equipment that is
maintenance records will be kept.
issued to and in use by Army activities worldwide.
4-106. Preparation of
Equipment for Administrative
b.
The requirements specified herein are necessary
Storage
to maintain the equipment in administrative storage in
such a way as to achieve the maximum readiness
Storage Site.
a.
condition.
(1) Select the best available site for
administrative storage. Separate stored equipment from
c.
Equipment that is placed in administrative
equipment in use. Conspicuously mark the area
storage should be capable of being readied to perform its
"Administrative Storage".
mission within a 24-hour period, or as otherwise
prescribed by the approving authority.
(2) Covered space is preferred.
d.
Report equipment in administrative storage as
(3) Open sites should be improved hardstand, if
prescribed for all reportable equipment.
available. Unimproved sites should be firm, well drained,
and kept free of excessive vegetation.
e.
Perform inspections, maintenance services, and
b.
Storage Plan.
lubrication as specified herein.
(1) Store equipment to provide maximum
Records and reports to be maintained for
f.
protection from the elements and to provide access for
equipment in administrative storage are those prescribed
inspection, maintenance, and exercising. Anticipate
by DA PAM 738-750, for equipment in use.
deployment
problems
and
take
removal or
suitable precautions.
actions
maintenance
When
determining
g.
required, 10% variance is acceptable on time, running
(2) Take into consideration such environmental
hours, or mileage.
conditions as extreme heat or cold; high humidity; blowing
sand, dust, or loose debris; soft ground; mud; heavy snows;
h.
Accomplishment of applicable PMCS, as
precautions.
mentioned throughout this section, will be on a quarterly
basis.
(3) Establish afire plan and provide for adequate
firefighting equipment and personnel,
4-105. Definition of
Administrative Storage
Maintenance Services and Inspection.
c.
a.
The placement of equipment in administrative
(1) Maintenance Services. Prior to storage,
storage can be for short periods of time when a shortage of
perform the next scheduled unit PMCS.
maintenance effort exists.