TM 9-2330-231-14&P
SERVICE UPON RECEIPT OF MATERIEL - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
UNPACKING
1.
Trailer
DD Form 1397
Read and follow all instructions.
2.
Metal strapping,
Using strap cutters and nail pullers,
plywood, tape,
remove all strapping, plywood, tape,
seals, and
seals, and wrapping.
wrapping
CHECKING UNPACKED EQUIPMENT
WARNING
Drycleaning solvent PD-680 is both toxic and flammable. Avoid prolonged breathing of vapors
and avoid skin contact. Do not use near open flame or excessive heat. Flash point of solvent is
138F (59C). Serious illness, injury, or loss of life could result.
3.
Coated exterior
Remove rust preventive compound using
parts
drycleaning solvent and rags.
4.
Trailer
a.
Inspect the equipment for damage
incurred during shipment.
b.
If the equipment has been damaged,
report the damage on DD Form 6, Pack-
ing Improvement Report.
c.
Check to see if equipment has been
modified.
5.
Equipment packing
a.
Check the equipment against the packing
list to see if the shipment is complete.
b.
Report all discrepancies in accordance
with the instructions in TM 38-750.
TASK ENDS HERE
PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT
Perform the operator and organizational preventive maintenance checks and services (PMCS) as described on pages 2-4 and
4-7.
Lubricate all lubrication points as shown in the Lubrication Chart (page 4-2), regardless of interval.
4-6