Click here to make tpub.com your Home Page

Page Title: Chapter 6. GENERAL SUPPORT TESTING PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SWITCH CLEANING
Up
TM-11-6625-524-14-4 Voltmeter Electronic ( NSN 6625-01-124-0834) (Millivac Instruments Model MV-828A) (NSN 6625-01-119-7271) Manual
Next
PRE-AMPLIFIER AND POST AMPLIFIER TEST

TM 11-6625-524-14-4
GENERAL SUPPORT TESTING PROCEDURES
GENERAL
These testing procedures are used to determine the acceptability of repaired
equipment. These testing procedures set forth specific requirements that the re-
paired equipment must meet before it is returned to the using organization.
Perform the testing procedure steps in sequence, do not vary. All tests to be done
w i t h the voltmeter out of its cabinet.
Schematic Diagrams F0-1 and F0-2 should be used as reference sources.
TEST EQUIPMENT REQUIRED
T h e test equipment required for general support testing is listed below:
Manufacturer and model number*
Item
Name
Hewlett-Packard 200CD
A1
Oscillator
Hewlett-Packard 400EL
AC voltmeter
A2
Tektronix 503
A3
Oscillator
Millivac 864A
DC multimeter
A4
A5
Variable
Superior Electric power stat 116
transformer
* Equivalent items may be used.
POWER SUPPLY TEST
a.
Test equipment.
(1) AC voltmeter
(2)  Oscilloscope
(3) DC multimeter
(4)  Variable  transformer
b.
Test connections: C o n n e c t the voltmeter (U.U.T.) to the variable transformer
which is connected to a 115-volt, 60Hz source.
Procedure.
c.
( 1 ) Set the voltmeter (U.U.T.) to the 3 VOLT full scale range position.
(2) Using the AC voltmeter, measure the voltage and adjust the variable
t r a n s f o r m e r ' s output for 115-volt.
(3) On the U. U. T., turn POWER switch to ON.
( 4 ) Connect the DC multimeter, set to -30V DC, between power supply
board terminals 2TP1 and 2TP2 (2TP2 is the negative side).
( 5 ) M e a s u r e -13.5V to -15.5V. If not, adjust power supply board control
(2R13) until a reading of -14.5V occurs.
( 6 ) Disconnect the DC multimeter, reset to -10V DC and reconnect between
2TP1 and chassis (chassis is the negative side).
( 7 ) M e a s u r e -5.4V to -6.6V.
(8) Disconnect the DC multimeter, reset to +10V DC and reconnect between
2TP2 and chassis (chassis is the negative side).

Privacy Statement - Press Release - Copyright Information. - Contact Us