Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CHAPTER 4 AIR TRANSPORTABILITY TM GUIDANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
CHAPTER  3 SAFETY
Up
TM-55-2350-262-14 Truck 5 Ton 6x6 M939 Series/ M939A1 Series/ M939A2 Series Manual
Next
Figure 4-1 Tiedown diagram for the M9 ACE in C-130 Aircraft

CHAPTER   4 AIR  TRANSPORTABILITY TM GUIDANCE 55-2350-262-14 4-1.   Scope This chapter provides air transportability guidance for the movement of the M9 ACE vehicle. It covers technical  and  physical  characteristics,  as  well  as safety   considerations, and  prescribes  the  man- power,   material,   and   time   required   to   prepare, load,  and  tie  down  the  vehicle  on,  or  unload  the vehicle from, U.S. Air Force aircraft. 4-2.   Maximum   Utilization   of   Aircraft The  loads  described  in  this  section  are  not  maxi- mum  loads.  General  guidance  on  total  cargo  loads and   on   operating   ranges   is   provided   in   TM 38–236/AFP 71–8. Additional cargo and/or person- nel  within  allowable  load  limits  and  restrictions prescribed  by  pertinent  safety  regulations  can  be transported. 4-3.   Applicability a.  U.S.  Air  Force  Aircraft.  The  M9  ACE  is transportable  in  C–130,  C–141,  and  C–5  aircraft. Procedures in this manual and those prescribed in TO  1C-130A-9,  TO  1C-141A-9,  and  TO  1C-5A-9 are applicable. b.  Tiedown.   This  vehicle  is  tied  down  in  ac- cordance  with  the  applicable  TO  1C–XXX–9,  sec- tion  IV.  Figures  4–1  through  4–3  show  the  sug- gested  tiedown  patterns  for  the  M9  ACE  in  the C-130,  C-141,  and  C-5  aircraft,  respectively.  Ta- bles  4-1  through  4-3  show  the  suggested  tiedown patterns for the M9 ACE in the C-130, C-141, and C-5  aircraft,  respectively.  Tables  4-1  through  4-3 list  the  tiedown  devices  required,  the  locations  of tiedown points, the corresponding fittings to which the  devices  are  secured,  the  number  and  capacity of the devices, and the lumber shoring required for loading and/or securement. (1)  The  rolling  shoring  requirements  listed in  tables  4–4  and  4–5  are  to  be  applied  in sequence  from  the  top  to  the  bottom  of  the  table, with  the  first  items  for  the  ground,  the  second  for the  ramp,  and  so  forth  (see  figs  4-4  and  4-5).  For the  C–5,  rolling  shoring  may  have  to  be  leap- frogged,  depending  on  the  desired  tiedown location. (2) Parking/sleeper shoring is to be applied as shown in figures 4–6 and 4–7. c. Loadmaster   Responsibilities.   The   loadmaster will  ensure  that  the  vehicle  is  loaded  and  secured in  accordance  with  the  applicable  TO  1C–XXX–9. 4-4.   Safety Besides  the  safety  precautions  contained  in  chap- ter 3, the following considerations should be noted: a.  The  height  of  the  M9  ACE  must  be  reduced for  transport  in  C-130  and  C-141  aircraft. b. Sleeper  and  parking  shoring  are  required  in all aircraft. c.  Relieve  track  tension  until  the  track  lies directly  on  top  of  road  wheel  four  prior  to  loading aboard the aircraft. d. Position  suspension  to  the  UNSPRUNG  mode for  loading/offloading  and  to  the  SPRUNG  mode for flight. e.  The  fuel  load  must  be  reduced  to  25  percent, and  the  components  must  be  repositioned  in  the bowl before loading operations. f.   Once   the   vehicle   is   loaded   in   the   aircraft, relieve the hydraulic pressure to allow the vehicle to settle on the bump stops faster. 4-5.  Preparation  of  Vehicle a. Personnel   Requirement.   At  least  one  heavy equipment  operator,  heavy  equipment  mechanic, and  wrecker  operator  are  required  to  prepare, load,  unload,  and  place  the  M9  ACE  in  operation. Additional   support   personnel   (MOS   immaterial) with   minimum   familiarization   of   the   equipment will reduce preparation time. b.   Equipment   and   Materials.   The   following equipment  and  materials  are  required  for  prepar- ing and placing the M9 ACE in operation: (1) TOOl  kit, mechanic (2) Wrecker, 5-ton (3)  Shoring  (tables  4-4  and  4-5) (4) Socket set, heavy-duty, 3/4-inch drive (5)  Handle,  socket,  3/4-inch  square  drive,  20- l/2-inch  length c. Preparation  Times.  Time  required  for  prepar- ing,  loading,  offloading,  and  placing  the  M9  ACE in operation will vary depending on existing condi- tions and personnel available. Time and personnel allotted  to  each  operation  are  for  planning  pur- poses. 4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing