Click here to make tpub.com your Home Page

Page Title: INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL.
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
Figure 3-1. Instrument Panel Components

TB 9-2350-368-25
11. Install transmission high temp indicator light (13) in instrument panel.
12. Install transmission low oil pressure indicator light (14) in instrument panel.
13. Install fuel gage (15) in instrument panel.
14. Install starter switch (16) in instrument panel.
15. Install preheat switch (17) in instrument panel.
16. Install tachometer (18) in instrument panel only if space is available, otherwise the tachometer should be
connected to tachometer cable and hand held.
17. Install starter relay (19) in instrument panel.
18. Install fabricated transmission controller (20) in instrument panel or vehicle transmission controller (21)
with four lockwashers (22) and four screws (23).
19. Install a 16 gage wire from Pin K at pack accessory cable on cart side. Run wire into instrument panel
and install glow plug indicator light assembly (24) in face of instrument panel. Connect wire to light and
connect a short piece of wire from other terminal to panel ground.
20. Install fuel switch (25) in instrument panel.
21. Install connectors (26 and 27) and gaskets in instrument panel.
3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us