Click here to make tpub.com your Home Page

Page Title: INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
INSTALLATION OF COMPONENTS ON TEST STAND-continued
Up
TB-9-2350-368-25 Fabrication and Operation of Powerplant Test Stand Manual
Next
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL-continued

TB 9-2350-368-25
3-3.
INSTALLATION OF COMPONENTS IN INSTRUMENT PANEL.
Bill Of Materials
Item
Nomenclature
Part Number
NSN
Qty
Hardware
1
Circuit Card
12354615
5999-01-246-1023
1
2
Screw
MS35206-262
4
3
Washer
MS27183-42
5310-00-014-5850
4
4
Lockwasher
MS35333-39
5310-00-576-5752
4
5
Wiring Harness STE/ICE
12354594
5995-01-239-1971
1
6
Gasket
MS52000-10
5330-00-948-0704
1
7
Gasket
MS52000-12
5330-00-827-2815
1
8
Screw
MS35190-239
5305-00-958-5451
8
9
Washer
MS15795-903
8
10
Nut
MS21083N6
5310-00-926-1852
8
11
Cap
12258943
5935-01-114-5354
1
12
Screw
MS35207-264
1
13
Nut
MS21083N3
1
14
Circuit Breaker
MS25244-15
5925-00-686-3301
4
15
Gage, Water Temperature
MS24543-2
6685-00-936-2139
1
16
Gage, Voltage
MS24532-2
6625-01-086-9580
1
17
Indicator Light
8376499
6210-00-699-9457
5
18
Gage, Fuel
EGO375
6680-00-933-3600
1
19
Switch, Starter
12313366
5930-01-204-4458
1
20
Switch, Preheater
3101-0018
5935-00-075-7006
1
21
Gage, Tachometer
MS35916-2
6680-00-825-2076
1
22
Relay, Electromagnetic, Starter
1114536
5945-00-735-9542
1
23
Controller, Transmission
Fabricated
1
24
Controller, Transmission
12349915
3010-01-245-2442
1
1. Install STE/ICE circuit card assembly (1) on four weldnuts in instrument panel with four screws (2),
washers (3), and lockwashers (4) (see Figure 3-1).
2. Connect STE/ICE harness to STE/ICE circuit card assembly (1) in instrument panel.
3. Install wiring harness connectors (5 and 6) and gaskets in instrument panel with eight screws, washers,
and nuts.
4. Install cap on DEC connector (J2) and secure chain to box with screw and nut.
NOTE
Connector J1 should be connected to the engine connector.
Connector J2 should be connected to the DEC for testing.
5. Install four circuit breakers (7) in instrument panel.
6. Install engine water temperature gage (8) in instrument panel.
7. Install voltage gage (9) in instrument panel.
8. Install engine low oil press indicator light (10) in instrument panel.
9. Install transmission clogged filter indicator light (11) in instrument panel.
10. Install master power indicator light (12) in instrument panel.
3-5

Privacy Statement - Press Release - Copyright Information. - Contact Us