Click here to make tpub.com your Home Page

Page Title: SPEED CONTROL RPM ADJUSTMENT-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
SPEED CONTROL RPM ADJUSTMENT-continued
Up
TB-5-2520-551-24 Installation Instructions for Truck Installtion Kit TRQ-32(V) Manual
Next
FIGURE 1. W-67 CABLE ASSEMBLY

TB 5-2520-551-24
SPEED CONTROL RPM ADJUSTMENT (cont.)
23. With engine running at operating temperature, check for contact between
upper radiator hose and W-65 cable. If no contact is made, turn vehicle
engine off, then place gear shift lever to PARK, and transfer case lever to
2H.
24. If contact is made, between radiator hose and W-65 cable, turn engine off
and allow engine to cool.  Using a 1/4" flat tip screwdriver, loosen screw
securing hose clamp at upper end of radiator hose. Twist radiator hose
1/4 turn clockwise.  Using same tool tighten screw securing hose clamp.
61

Privacy Statement - Press Release - Copyright Information. - Contact Us