Back
Service ­ Electroencephalography Laboratory
Up
Room Finishes, Door and Hardware Schedule
Next
Service - Engineering (cont)



Department of Veterans Affairs
Program Guide PG-18-14
Office of Facilities Management
Chapter - 230
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Engineering
ROOM OR SPACE
FINISHES
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
Administrative Space:
Chief
CP
RB
GWB-W
AT
1/2 S
23
Assistant Chief
CP
RB
GWB-W
AT
1/2 S
23
Secretary & Waiting
CP
RB
GWB-W
AT
1/2
13
S-T/Open
Fire & Safety
CP
RB
GWB
AT
1/2 S
23
Specialist/ Officer
Industrial Hygienist
CP
RB
GWB
AT
1/2 S
23
Other Clerical,
CP
RB
GWB
AT
1/2 S
23
Technical or
Administrative
Employees
GWB-W1
Conference Room
CP
RB
AT
1/2 U-T
40
Project Engineer
CP
RB
GWB-W
AT
1/2 S-T
23
Hospital Plans &
VCT
RB
GWB
AT
1/2 U-T
23
Drafting Room
Driver Dispatch &
VCT
RB
GWB
AT
1/2 S-T
23
Ready Room
Staff Lockers &
See Chapter 410
Toilets
62
Corridor
VCT
RB
GWB
AT
1/2 VV-T
Biomedical
VCT
RB
GWB
AT
1/2 SS-T
82
Engineering Repair
Shop
Shop Areas:
C3
CMU
AT
1/2 SS-W
82
Carpenter Shop
C3
Air Conditioning
CMU
AT
1/2 SS-T
82
C3
Plumbing Shop
CMU
AT
1/2 SS-T
82
C3
Electrical Shop
CMU
AT
1/2 SS-T
82
C3
CMU
AT
9/10 V-W
42
Paint Shop
1
See Design and Construction Procedures PG-18-3, Topic 11, "Noise Transmission Control".
2
See Section II, "Doors and Hardware".
3
These floors shall be finished with a colored hardener (non-slip).
53