Chapter - 224
December 2004
ROOM FINISHES, DOOR AND HARDWARE SCHEDULE
Service - Dietetic Service
ROOM OR SPACE
FINISHES
DOORS
HARDWARE
FLOOR
BASE
WALLS
WAINS
CEILING
DOOR
H.W.NO.
SYMBOL
Special1
Refrigerated
QT
QT
Garbage Storage and
Trash
Cleaning Equipment
QT
QT
CT
AT (SP)
2 SS-T
82
Facilities
Food Processing and
QT
QT
CT
AT (SP)
Preparation
Nourishment
QT
QT
CT
AT (SP)
3/4 V-T or
4
Preparation
Open
Ingredient Control
QT
QT
CT
AT (SP)
3/4 V-T
4
Area
Housekeeping Aids
QT
QT
CT
AT (SP)
1/2 T
13
Closet
Food Storage Area
QT
QT
GWB
AT
1/2 V-T
69
Receiving Area
VCT
RB
GWB or
AT
Automatic
CMU
Roll-up
9'0" x
(SC)
10'0"2
Nonfood Storage
VCT
RB
GWB or
AT
1/2 V-T
69
CMU
(SC)
Sanitation Supply
QT
QT
GWB or
AT
1/2 V-T
69
Storage
CMU
(SC)
Special31
Refrigerated and
Frozen Storage,
(Preprocessing)
Nutrition Clinic
CP
RB
GWB
AT
1/2 V-T
52
Corridor
VCT
RB
GWB
CT
AT
1/2 VV-T
82
5'0"
1
Prefabricated, walk-in refrigerator with finished floor flush with adjoining floor.
See Design and Construction Procedures PG-18-3, Topic 6, "Floor Slab Depressions".
2
See Standard Details PG-18-4.