Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 2-2. Electrical Troubleshooting
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
67.  TRUCK  DRIVES  WITH  TRANSMISSION  GEARSHIFT  SELECTOR  IN  NEUTRAL
Up
/.25ton/TM-9-2320-289-34 CUCV Series Trucks at intermediate direct support and general support level Manual
Next
BATTERIES/CHARGING    SYSTEM

TM   9-2320-289-34 Table   2-2.   Electrical   Troubleshooting MALFUNCTION TEST  OR  INSPECTION CORRECTIVE ACTION AIR   CONDITIONER 1. COOLING INSUFFICIENT Step  1. Test  air  conditioning  system,  (See  paragraph  10-20)  Record  low  and  high  pressure readings, If   low   and   high   pressure   readings   are   within   specifications,   system   is operational. If  high  pressure  reading  is  not  within  specifications,  perform  step  2. Step  2. Check  for  24  volts  at  light  blue  lead  terminal  at  24  volt  air  conditioner  relay. If  there  is  voltage,  system  is  operational. If  there  is  no  voltage,  perform  step  3. CAUTION DO   NOT   operate   air   conditioner   for   extended   periods   with   condenser cover   assembly   removed.   Failure   to   follow   this   caution   may   result   in damage   to   air   conditioning   system   due   to   high   head   pressure. Step  3. Remove  condenser  cover  assembly.  (See  TM  9-2320-289-20)  Attempt  to  operate air  conditioning  system.  Trace  light  blue  lead  from  24  volt  air  conditioner  relay  to red  lead  at  low  pressure  switch.  (See  wiring  diagram  E-26) If  there  is  voltage,  repair  circuit. If  there  is  no  voltage,  perform  step  4. Step  4. Trace  circuit  to  black  lead  on  high  pressure  switch.  (See  wiring  diagram  E-26) If  there  is  voltage,  replace  low  pressure  switch.  (See  paragraph  10-27) If  there  is  no  voltage,  perform  step  5. Step  5. Remove  air  conditioner  control  panel.  (See  paragraph  10-22)  Trace  circuit  to  “A/C COLD”  switch.  (See  wiring  diagram  E-26) If  there  is  voltage,  replace  high  pressure  switch.  (See  paragraph  10-27) If  there  is  no  voltage,  perform  step  6. Step  6. Trace   blue   lead   to   “VENT-A/C”   switch.   (See   wiring   diagram   E-26) If   there   is   voltage,   replace   “A/C   COLD”   switch.   (See   paragraph   10-22) If  there  is  no  voltage,  perform  step  7. 2-41

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing