Figure 4-6. Air loch light assembly, installation (sheet 1 of 2 )
Up
TM-10-5410-223-14-1 Shelter Multi Purpose Medical Unit Self-Contained Transportable (MUST); (Brunswick Model CW1) NSN 5410-00-809-6634 Manual
Next
Figure 4-7. Shelter, multipurpose handling points.

TM
10-5410-223-14/ 1
2. WITH THE LIGHT ASSEMBLY ATTACHED, SECURE THE POWER CABLE TO THE
AIRLOCK ASSEMBLY USING THE REMAINING PATCH ASSEMBLIES. CONNECT
THE CABLE TO THE APPROPRIATE POWER SOURCE. `
TS 016744
Figure 4-6. Air lock light assembly, installation (sheet 2 of 2 ).
Section II. MOVEMENT TO A NEW WORK SITE
accomplished by crane hoist, hooked to the lifting
4-4. Dismantling for Movement
eyes on the multipurpose shelter, fork lift, wheeled
In general, the procedures for dismantling the
transporter dolly set, 5 ton cargo truck, or the
multipurpose shelter are the reverse of those used for
multipurpose shelter may be skidded for short
erection. All accessory equipment, furniture, or
distances. The 2-1/2 or 5 ton (2.26 or 4.54 mt)
other items installed in the shelter during use shall
military truck may be used for towing the shelter.
be removed and all external utility services shall be
See figure 4-7 for location and identification of
off or disconnected prior to dismantling shelter.
handling points and hardware. Perform the various
4-5. Handling
handling operations as follows:
Handling of the multipurpose shelter may be
4-33