Click here to make tpub.com your Home Page

Page Title: Figure 4-1. Erection of shelter, multipurpose (sheet 12 of 13)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-1. Erection of shelter, multipurpose sheet 11 of 13)
Up
TM-10-5410-223-14-1 Shelter Multi Purpose Medical Unit Self-Contained Transportable (MUST); (Brunswick Model CW1) NSN 5410-00-809-6634 Manual
Next
Figure 4-1. Erection of shelter, multipurpose (sheet 13 of 13)

TM 10-5410-223-14/1
C1
12. INSERT LOWER END OF SUPPORT ASSEMBLY INTO THE DEEP DRAW CAN OF THE
FOLDING FLOOR. DEPRESS THE HANDLE ON THE UPPER END OF SUPPORT
ASSEMBLY. PUSH SUPPORT ASSEMBLY INTO PLACE AND RELEASE THE HANDLE
FORCING THE PLUG AT THE UPPER END INTO THE DEEP DRAW CAN OF THE
FOLDING ROOF.
NOTE: IF SUPPORT ASSEMBLY CANNOT BE INSTALLED ADJUST THE FOLDING
FLOOR SUPPORT CABLE. FOLLOW THE SAME PROCEDURE WHEN IN-
STALLING THE OTHER SUPPORT ASSEMBLY.
T S 016722
Figure 4-1. Erection of shelter, multipurpose (sheet 12 of 13).
Change 1, 4-11

Privacy Statement - Press Release - Copyright Information. - Contact Us