Click here to make tpub.com your Home Page

Page Title: Table 2-1. Consumable Supplies
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 2-2. Operation of door and fabric enclosure blackout curtains (sheet 2 of 2 )
Up
TM-10-5410-223-14-1 Shelter Multi Purpose Medical Unit Self-Contained Transportable (MUST); (Brunswick Model CW1) NSN 5410-00-809-6634 Manual
Next
CHAPTER 3 OPERATOR'S MAINTENANCE INSTRUCTIONS

TM 10-5410-223-14/1
Table 2-1. Consumable Supplies.
(4)
(3)
(2)
(1)
National
Stock
Unit
Number
Description
Item
Qt
1357
8040-00-290-4301
Adhesive (contact cement)
Gal
6810-00-281-2002
Toluene
1 in, (2.5cm) W x 1¾ in.
8020-00-597-4762
Brushes
(4.4cm)
Paper Towels
7920-00-543-6492
(Kim Wipes)
Enamel, Semi gloss pale
Color No. 24554 or equal
green
TT-E-529
Color No. 34087
8010-00-297-0560
Enamel Flat,
TT-E-527
Olive drab
889351-61 (26533)
Paddle, mixing coated cloth
Type 1 class 1 MIL-C-43285
(OG 8 black)
7350-00-178-6784
Mixing cup
2640-00-264-6642
Talc lubricant
EC 7763MCO
Sealant
8040-00-042-8761
Epoxy
1 qt.
Bostik 1007P
8040-00-598-6164
Adheeive primer
(.95 liters)
Zipper ease
Section II. OPERATION UNDER UNUSUAL CONDITIONS
2-10. Operation in Snow and Ice
2-5. Operation in Extreme Cold
Procedures for operation in snow and ice areas as
a. Check fabric enclosure to ensure weather seal at
follows:
windows is closed.
a. Sweep snow from exterior of shelter with a soft
b. Close and secure door.
bristled brush or broom.
c. Install window panel inserts.
b. When ice build-up exists on exterior of shelter,
2-6. Operation in Extreme Heat
apply bleed air and/or hot air from a utility
No special operations required.
element heating unit.
2-7. Operation in Dusty or Sandy Areas
2-11. Operation in Mud
No special operations required.
When muddy conditions exist proper leveling may
become a factor. Continuous checks of levels and
2-8. Operation Under Rainy or Humid Conditions
adjustments to leveling jacks should be made as
Procedures for operation under rainy conditions as
required.
follows:
2-12. Operation at High Altitudes
a. Provide adequate drainage ditches to prevent
No special operations required.
standing water in area.
b. Check fabric enclosure to ensure weather seal
2-13. Operation in High Winds
at window is closed.
Procedures for operation during high wind con-
c. Close and secure door.
ditions are as follows:
d. Install window panel inserts.
a. Check fabric enclosure to ensure weather seal at
2-9. Operation in Salt Water Areas
windows are closed.
No special operations required.
b. Close and secure the door.
c. Install window panel inserts.
2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us