TM 10-5411-236-13&P
0010 00
When an NBC attack is expected, and time allows, the ASLMS should be packed for transport with
ventilation devices secured per WP 0009 00 until the threat of attack is over. If an NBC attack occurs, the
unit must be decontaminated before use in accordance with FM 3-5.
Operation During Blackout Conditions
The ASLMS can be operated during blackout conditions, using the EPC and access flaps with red
operational lighting.
1.
Ensure the EPC access flaps are closed.
2.
Place the 12 VDC lighting fixtures in the RED operational mode.
END OF WORK PACKAGE
0010 00-3/(4 Blank)
Change 1