TB 9-4940-316-30
Section III. INSTALLATION IN ISO-2-1 SHELTER
5.
Installation
Install two 5/16-in. blind rivet nuts (11021235-3) in
NOTE
Hand blind riveter (5120-00679-6523)
is used to install blind rivet nuts in
(3)
Mark and drill fourteen 0.50 in.
floors and walls. Install blind rivet
diameter holes in floor and right wall, in accordance with
nuts in accordance with MIL-N-47187.
Position floor mounted equipment
Inject potting compound as required and install ten 3/8-
and support angles as shown in
in. blind rivet nuts (11021235-2) in accordance with
equipment
mounting
holes
as
templates for location of blind rivet
b. Secure one strap loop (MS519393) for
17, and 19. Position wall mounted
first aid kit and fire extinguisher as
and 17, using two #10 x 1/2-in. countersunk head
machine screws,(MS35190-271)
equipment
mounting
holes
as
templates for location of blind rivet
NOTE
Eighteen 5/16-in. blind rivet nuts are
supplied in the floor, of which two are
a. Follow steps 1 thru 3 for installing blind rivet
used for component installation
nuts.
CAUTION
c. Fabricate two support angles (11021208) in
After installing blind rivet nuts,
Fabricate one bench top
(11021209) in accordance with figure 21. Fabricate one
must have a curing time of 24 to 48
shelf (11021210) in accordance with figure 22
hours before using any threaded
fasteners
d. Follow steps 1 thru 17 below for equipment
installation in ISO shelter, unit 2.
(1)
Mark
and drill eight 0.25-in
diameter holes in right side
wall, in accordance with
(1)
Mark and drill four 0.41-in.
1.00-in. maximum. Inject
diameter holes in bottom plate of 20 drawer cabinet
potting compound as required
and install eight #10 blind
rivet nuts 11021235-5)
for minimum required clearance for 0.38-in hex head
capscrews.
(2)
Mark and drill eight 0.42-in
diameter holes in fixed floor and deployed floor, four
holes in each section, in accordance with figures 15 and
19, to a
depth of
1.50-in. maximum. Inject potting
compound as required and install six 5/16-in. blind rivet
11