Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Removal
Up
TM-9-2350-256-20-2 Recovery Vehicle Full Tracked: Medium M88A1 NSN 2350-00-122-6826 (EIC AQA) Volume II Manual
Next
BATTERIES, BATTERY TRAYS, AND TERMINAL MAINTENANCE
TM 9-2350-256-20-2
0152 00
11. Remove bracket (31) by removing four screws (32) and four lockwashers (33).
Installation
1.
Install bracket (31) using four screws (32) and four lockwashers (33).
2.
Install starter module (27) using two screws (28), four lockwashers (29), and two self-locking nuts (30).
3.
Connect connector (26) to starter module (27).
4.
Install starter support (23) using three machine bolts (24) and three flat washers (25).
5.
Install starter cradle (20) using four screws (21) and four flat washers (22).
6.
Install starter (16) and gasket (17) using three bolts (18) and three self-locking nuts (19).
7.
Secure starter (16) to starter cradle (20) using U-bolt (13), two self-locking nuts (14), and two clamping bars (15).
8.
Connect lead (10) using nut (11) and lockwasher (12).
9.
Connect two cables (7) using nut (8) and lockwasher (9).
10. Connect ground lead (2) using machine bolt (5) and flat washer (6).
11. Connect three cables (1) and ground lead (2) using nut (3) and lockwasher (4).
12. Install test cables and hoses. Test run engine prior to installation and check for proper starter operation.
NOTE
Follow-on maintenance: Install powerplant (see WP 0098 00).
END OF WORK PACKAGE
0152 00-3/4 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us