Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: To Install Fuel Pump
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Back
Operation
Up
TM-5-4240-501-14P Special Diver Air Support System (SDASS) NSN 4220-01-292-3708 Manual
Next
Section 4 GOV.  CONTROLS & CARB.  LINKAGE

TM 5-4240-501-14&P Fig. 122 - Fuel Pump To Install Fuel Pump Place a liberal supply of grease or gear lubricant on the portion  of  fuel  pump  lever  that  contacts  the  crankshaft. Fig.  123.    Assemble  fuel  pump  to  cylinder  using  new gasket.    Keep  mounting  face  of  fuel  pump  parallel  to mounting  face  of  cylinder  while   inserting   lever   of   fuel pump.  The lever must ride in the narrow groove which is located   on   the   crankshaft   between   the   gear   and   the counter- weight.  Revolve crankshaft to be sure that fuel pump   is   correctly   installed.      Assemble   fuel   pipe   from outlet    of    carburetor.        Fuel    supply    pipe    should    be connected to the inlet of the fuel pump. Fig. 123 -- Installing Fuel Pump CARBURETION Fuel Pumps, Automatic Chokes, Two Piece Flo-Jet AUTOMATIC CHOKE Automatic Choke Adjust Hold  choke  shaft  so  thermostat  lever  is  free.    At  room temperature the screw in the thermostat collar should be in the center of the stops,  if  not,  loosen  stop  screw  and adjust. Loosen    set  screw  on    lever  of  thermostat  assembly. Slide    lever    to    right    or    left    on    shaft    to    insure    free movement    of    choke    link    in    any    position.        Rotate thermostat shaft clockwise until stop screw strikes  tube. Fig. 124.  Hold in position and set lever on the thermostat shaft  so  that  choke  valve  will  be  held  open  about  1/8" from closed position.  Then tighten set screw in lever. Rotate    thermostat    shaft    counterclockwise    until    stop screw strikes the opposite side of tube.  Fig. 124.  Then open choke valve manually until it  stops  against  the  top of the choke link opening.  The choke valve should now be open approximately 1/8" as before. Fig. 124 - Adjust Automatic Choke Check  position  of  counterweight  lever.    With  the  choke valve in wide open position (horizontal) the counterweight lever should also be in a horizontal position with free end toward the right. Operate the choke manually to be sure that all parts are free to move without binding or rubbing in any position. 35

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing