Click here to make tpub.com your Home Page

Page Title: Figure 4-11. Personnel Platform Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Personnel Platform R e p l a c e m e n t
Up
TM-9-6115-652-14-P Power Unit PU-760/M (NSN 6115-00-394-9581) MEP-114A 30 Kw 400 Hz Generator Set Manual
Next
Chapter 5. DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS

TM
9-6115-652-14&P
Figure 4-11. Personnel Platform Replacement.
b. I n s t a l l a t i o n .
NOTE
If mounting brackets have not been removed, omit step (1).
(1)
Position each mounting bracket (5) on trailer frame (10). Insert three screws (7) through frame into each
bracket. Install one washer (8) and one self-locking nut (9) on each screw and tighten.
(2)
Holding platform (4) in vertical position, position platform on mounting brackets (5) so that holes in
platform line up with holes in brackets and install platform anchors (6) in upper mounting hole on each
side of platform.
Secure platform (4) to brackets (5) with two screws (1), four flat washers (2) and two self-locking
(3)
nuts (3).
4-23/(4-24
blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us