Click here to make tpub.com your Home Page

Page Title: Front Step Replacement
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Figure 4-7. Fire Extinguisher Bracket Replacement.
Up
TM-9-6115-652-14-P Power Unit PU-760/M (NSN 6115-00-394-9581) MEP-114A 30 Kw 400 Hz Generator Set Manual
Next
Figure 4-8. Front Step Replacement

TM
9-6115-652-14&P
4 - 2 0 . F r o n t S t e p R e p l a c e m e n t . (See figure 4-8.) The roadside and curbside front steps are symmetrical,
and replacement procedures are the same except where noted in the steps below.
a. R e m o v a l .
NOTE
(1) and (2).
When removing roadside front step, omit steps
Remove fuel can brackets (paragraph 4-17, a).
(1)
Remove accessory box (paragraph 4-18, a).
(2)
Remove cotter pin (1, figure 4-8) and clevis pin (2) securing handbrake cable (3) to handbrake lever
(3)
mechanism
(4).
Remove two screws (5), two flat washers (6) and two nuts (7) securing handbrake (8) to trailer frame (9).
(4)
Remove two screws (10), two flat washers (11) and two nuts (12) securing handbrake cable bracket (13)
(5)
to front step (14).
NOTE
There are two screws, flat washers, and nuts securing handbrake bracket to front step. It
is only necessary to remove one set of attaching hardware to remove front step from
trailer frame.
Remove screw (15), flat washer (16), Iockwasher (17) and nut (18) directly beneath pivot point of
(6)
handbrake lever (4).
Remove seven screws (19), 14 flat washers (20) and seven nuts (21) securing front step (14) to front
(7)
edge offender (22).
Remove four screws (23, 24 and 25), eight flat washers (26) and four nuts (27) securing front step (14)
(8)
to edge of trailer frame (9).
Remove three screws (28), three flat washers (29) and three nuts (30) securing front step (14) to trailer
(9)
cross brace channels (31) and remove front step (14) and spacers (32) and (33).
Installation.
b.
NOTE
Three different length screws are used to mount the front step. Screws with index
numbers (5), (10), (18) and (23) in figure 4-8 are one inch long. Screw with index number
(24) is 1-1/4 inch long. Screws with index numbers (15), (22) and (27) are 1-3/4 inch
long. Observe lengths and locations when installing hardware.
4-16

Privacy Statement - Press Release - Copyright Information. - Contact Us