Click here to make tpub.com your Home Page

Page Title: Section V. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Reinstallation After Movement
Up
TM-9-6115-652-14-P Power Unit PU-760/M (NSN 6115-00-394-9581) MEP-114A 30 Kw 400 Hz Generator Set Manual
Next
Table 4-1. Unit Preventive Maintenance Checks and Services (PMCS).

TM
9-6115-652-14&P
Clean parts in a well-ventilated area. Avoid inhalation of solvent fumes and prolonged
exposure of skin to cleaning solvent. Wash exposed skin thoroughly. Dry cleaning
solvent (PD-680) used to clean parts is potentially dangerous to personnel and property.
Do not smoke or use near open flame or excessive heat. Flash point of solvent is 100°F
to 138°F (38°C to 59°C).
(1) Using PD-680, or equivalent, clean area to be lubricated.
(2) Apply OE lubricating oil to personnel platform pivot points and to platform anchor quick-release pins.
Section
V.
PREVENTIVE
MAINTENANCE
CHECKS
AND
SERVICES
NOTE
The PMCS chart in this section contains all necessary unit preventive maintenance
checks and services for this equipment.
4-10. G e n e r a l . The trailer assembly and generator set must be inspected and serviced systematically to insure
that the power unit is ready for operation at all times. Inspection will allow defects to be discovered and corrected
before they result in serious damage or failure. Table 4-1 contains a tabulated list of preventive maintenance
checks and services to be performed by unit maintenance personnel. All of the unit PMCS on the trailer is
scheduled to be performed semiannually. Unit PMCS on the generator set is scheduled monthly or on a
per-hours-of-operation basis. The running time meter on the control panel is used to determine the operating time
of the generator set. Using the following as a guide, do the checks and services at the intervals shown. Observe
a l l CAUTIONS and WARNINGS.
a. For PMCS performed on an operating time basis, perform your hourly (H) PMCS as close as possible to the
time intervals indicated.
NOTE
For units in continuous operation, perform PMCS before starting operation if continuous
operation will extend service interval past that which is shown.
b. Perform your monthly (M) PMCS every month or 100 hours of generator set operating time.
c. Do your semiannual (S) PMCS once every six months or 500 hours of operating time.
d. If you discover a problem with the equipment, refer to Section VI, Troubleshooting. If you cannot correct the
problem, refer to paragraph 4-12, Reporting Deficiencies.
4-11. Explanation
Of
C o l u m n s . The following is a list of the PMCS table column headings with a
description of the information found in each column.
a.
Item No. This column shows the sequence in which to do the checks and services, and is used to identify
the equipment area on the Equipment Inspection and Maintenance Worksheet, DA Form 2404.