Click here to make tpub.com your Home Page

Page Title: Repositioning shop equipment - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Repositioning shop equipment - continued
Up
TM-55-4920-438-13-P Power Train Shop P/N SC-4920-97-CL-A65 NSN 4920-01 139-4631 Manual
Next
Repositioning shop equipment - continued

TM 55-4920-438-13&P
b. Install cable (3) and retainer block (2) with screws
(1).
NOTE
When floor is lowered, (to allow roof clearance for folding) the devices securing fold-out floor
counterbalance cables can be disengaged.
When all equipment and materiel is stored on the stationary side of the shelter, the limited floor
space presents a safety hazard to operating personnel. This is most critical during the raising
and lowering of the roof panel.  Failure to observe supplemental instructions could result in
serious injury to personnel. Personnel inside the shelter could become trapped between the roof
panel and equipment bolted to the floor.
2-30 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us