Click here to make tpub.com your Home Page

Page Title: Repositioning shop equipment - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Repositioning shop equipment - continued
Up
TM-55-4920-438-13-P Power Train Shop P/N SC-4920-97-CL-A65 NSN 4920-01 139-4631 Manual
Next
Repositioning shop equipment - continued

TM 55-4920-438-13&P
f. Securing davit crane boom.
1. Swing crane boom (1) under overhead solar
bar (2).
2. Remove strap (3) from storage chest.
3. Loop strap (3) under crane boom (1) and
over solar bar (2). Secure buckle.
Two vises, mounted on the bin
storage cabinets, must be positioned
so that handles are located toward
narrow sides of cabinets. If handles
are pointed in direction of movable
side  of  shelter  they  will  restrict
closing of the end wall and could
result in damage to the wall.
2-12. Storage procedures. In the event the Power Train
Shop is to be placed in storage the provisions of TM 740-90-1,
TM 743-200-1 and applicable shop equipment TMs will be
followed.
2-13. Striking the shelter. Procedures for striking the shelter
are contained in TM 10-5411-201-14.
In addition, the
following "Supplemental Instructions" will be observed.
a. Remove screws (1) at both corners of fold-out floor.
Change 1 2-29

Privacy Statement - Press Release - Copyright Information. - Contact Us