Click here to make tpub.com your Home Page

Page Title: Repositioning shop equipment - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Repositioning shop equipment - continued
Up
TM-55-4920-438-13-P Power Train Shop P/N SC-4920-97-CL-A65 NSN 4920-01 139-4631 Manual
Next
Repositioning shop equipment - continued

TM 55-4920-438-13&P
2. Remove four special retainer screws (3) from
top bar (4). Remove three special retainer screws (5) from
bottom bar (6). Stow screws in storage chest.
3. Repeat steps 1 and 2 with other ECU.
c. Repositioning ECUs in support frames.
Four people are needed when moving or lifting the Environmental Control Units (ECUs). Each
unit weighs approximately 270 pounds. Trying to move or lift an ECU without sufficient help can
cause serious injury to personnel.
1. Slide ECU (1) off end wall shelf (2).
2. Using lift handles (3) carry thru personnel door (4) and position in floor frame (5).
3. (For shelter P/N 136-0000-101) Slide ECU (6) off side wall shelf (7). For shelter P/N 5-4-2828-1) Slide
ECU (6) off end wall shelf (7A).
4. Using lift handles (3) carry thru cargo door (8) and position in floor frame (9).
2-24 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us