Setup of Power Train Shop upon initial receipt
Up
TM-55-4920-438-13-P Power Train Shop P/N SC-4920-97-CL-A65 NSN 4920-01 139-4631 Manual
Next
Counterbalance Cable Removal.

TM 55-4920-438-13&P
5. (For shelter P/N 5-4-2828-1) Close slide stops (1) against counterbalance cables (2) on both cable reels (3).
6. Securing the counterbalance cables will allow removal of the counterbalance cables attached to each end of
fold-out floor.
7. Continue with remaining procedures outlined in TM 10-5411-201-14 for final erection of shelter.
Change 1 2-2.1/(2-2.2 blank)