Click here to make tpub.com your Home Page

Page Title: Section IV. OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Back
Table 2-2. Operator Preventive Maintenance Checks and Services
Up
TM-55-4920-431-13 Auxiliary Power Unit Electronic Sequence Unit Multi-Purpose Test Set NSN 4920-01-121-0605 Manual
Next
Figure 2-2. Connecting Tester for Use in Aircraft

TM 55-4920-431-13
Section IV.
OPERATION UNDER USUAL CONDITIONS
2-4. Preparation for Use.
a. Turn pressure equalizer knob to OPEN. Open case. Turn knob to CLOSE.
b. Remove harnesses from case lid.
c. Connect harnesses as shown in figures 2-2 or 2-3.
d. Zero meters.
e. Perform your before (B) PMCS.
2-5. APU Test. Connect the tester for use in the aircraft in accordance with figure
2-2. Perform test in accordance with the applicable maintenance manual.
NOTE
During tests, leave BLEED AIR OPEN/CLOSE switch,
MAX. AIR switch, and ECONO AIR switch in down
position.
2-6.  ESU Test.  Bench test of the ESU is accomplished by using an oscillator to
simulate the tach input from the magnetic pickup in the APU. Millivolt supplies are
used to simulate EGT thermocouple inputs from the APU. Connections are made
through the ST93930 simulation device as shown in figure 2-3. Perform check in
accordance with TM 55-1520-240-T.
OPERATION UNDER UNUSUAL CONDITIONS
Section V.
Not applicable.

Privacy Statement - Press Release - Copyright Information. - Contact Us